This website uses cookies to improve your experience.
Rendering.no is a 3D animation studio in Stavanger, Norway, creating technically accurate 3D animations for offshore wind, floating wind and ocean energy. We bring more than a decade of subsea and offshore experience to renewable projects, for clients such as Hexicon, Wello, and Wind Catching Systems. New energy technology often looks unfamiliar, and much of it has never been built at full scale. We turn your CAD data into animations that show how a concept works, how it is installed and how it is maintained, so investors, partners and authorities can judge it on what it really does.
Renewable energy clients use our animations to raise investment, support grant and licence applications, win supply contracts and explain projects to the public. Early-stage developers often use them before a prototype exists, when a clear picture of the concept matters most. One CAD-based 3D scene gives you a full film, short loops for trade shows and social media, and high-resolution stills for reports and presentations, all consistent with each other.
Offshore wind is built and serviced with the same vessels, cranes, ROVs and seabed methods as oil & gas. We have animated those operations for more than a decade, so we know how a lift is rigged, how a cable is pulled in and how a vessel holds position. That knowledge goes straight into your animation, and your engineers spend their review time on your technology, not on correcting the basics.
Can you animate a wind or wave energy concept that has not been built yet?
Yes. Much of our renewable work shows concepts before a prototype exists, for investors, partners and grant applications. Our 2017 animation for Wello’s wave energy converter is one example.
Can you show moorings, cables and installation as well as the turbine?
Yes. We animate the whole lifecycle: fabrication, assembly, tow-out, mooring hook-up, cable pull-in, operation and maintenance.
How accurate are the animations?
We build from your CAD and STEP data and your engineers review the model and the sequences. If something is wrong, we fix it before the final render.
How do you protect unpublished or patent-pending designs?
We sign your NDA before any material is shared, keep data on studio-controlled storage and render in-house.
How long does an offshore wind animation take?
Most projects take 4 to 10 weeks from CAD to final film. It depends on the length of the film, the state of the CAD data and the overall complexity.
Do you work with developers outside Norway?
Yes. We work with clients across Europe and beyond, in English.
Cookie Settings
